SR 133 Widening from Spence Field to SR35 PI 431780 STP-032-2(28) Moultrie, Colquitt Co., GA Columbia is on the Wolverton Team to provide Preliminary, R/W and Final plans for 5-mile GRIP Corridor Project widening and reconstruction of SR 133 from Moultrie to Spence Field for the Georgia Dept. of Tra

Reconstruction of Interchange, GA SR3 / US19 at GA SR16, NH-001-4(62) Griffin, Spalding Co., GA Columbia has been selected by the Georgia Dept. of Transportation to provide Preliminary, R/W, and Final Plans for the improvements to the Limited Access Interchange of GA SR3 / US19 at GA SR16 which incl

GA SR135 from US441E to SR32, STP-079-1(42) Douglas, Coffee Co., GA Columbia has been selected by the Georgia Dept. of Transportation to provide Concept, Preliminary, R/W, and Final Plans for the estimated $19 million 3 mile widening of existing 2-lane roadway to a 4-lane divided highway with 20-foo